logo logo

Business

All-in-One Services for Digital Construction

R&D

A Pilot BIM-based Design and Analysis of Existing Power Cable Tunnel (2022 ~ 2023)

PROJECT OUTLINE

Client
Korea Electric Power Corporation (KEPCO)
Stage
Lead Research Organization
Period
Aug. 2022 – Jul. 2023

PROJECT FEATURES

  •  As part of KEPCO Research Institute’s project “Establishment of 3D BIM Design Procedures for Utility Tunnels,” BIM conversion design was performed for existing utility tunnels, along with 2D/BIM comparative analysis to establish a foundation for BIM adoption in KEPCO’s civil engineering sector.