All-in-One Services for Digital Construction

R&D

DfMA of Prefabricated Bridges (2020 ~ 2025)

PROJECT OUTLINE

Client
Ministry of Land, Infrastructure and Transport (MOLIT) / Korea Agency for Infrastructure Technology Advancement (KAIA)
Contractor
Chung-Ang University
Stage
Joint Research Organization
Period
Apr.28,2020 – Dec.31,2025 (5 years 8.1 months)

PROJECT FEATURES

  •  DfMA-oriented parametric BIM : Alignment Interactivity Technology of Prefabricated Structure Module & Data Analysis Algorithm Development for Supporting Prefabrication Manufacture
  • Improved Productivity and Quality of Prefabricated Structures through BIM-Based Design
  • Selection of the Optimal Alternative through Design Stage Evaluation
  • Library Storage and Management Function
  • Operated as an Add-on to Commercial Software
  • Integration of Prefab Production Information through Manufacturing Data Analysis