Gyeongjeon Line Single-track electrification, Lot 4 (Nov. 2023 – May 2024)

PROJECT OUTLINE

Owner
KOREA RAIL NETWORK AUTHORITY (KR)
Stage
Design & Construction Tender (2023, Award)
Contractor
Hanwha Engineering & Construction Coorp

PROJECT FEATURES

  • Lot 4 Railway L=20.52km
  • Bridge L=0.835km, Tunnel L=10.940km
  • Reform of the existing Beolgyo Station
  • The contractor shall develop BIM deliverables following the requirements specified in the TOR (Terms of reference) of the KRBIM.
  • Project Information Model (PIM) for project lifecycle : Design & Construction Models, As-Built Models, Asset Information Models