Power plant

Hydropower Hongcheon - Renewable Water Batteries (Apr. 2024 – May 2033)

PROJECT OUTLINE

Client
Korea Hydro & Nuclear Power Co., Ltd. (KHNP)
Stage
Design & Construction Management (2023.12 ~ 2033.05)
Current Stage
Basic Design Stage
Design Consultants
ISAN Corporation, Yooshin Corporation

PROJECT FEATURES

  • The Hongcheon Hydroelectric Power Plant Project aims to build a variable-speed pumped storage power plant with a total capacity of 600 MW (300 MW × 2 units)
  • Upper Dam Type: CFRD (Concrete Face Rockfill Dam), H = 109.8 m, L = 548.9 m
  • Upper Dam Effective storage : 7,730,000 m3
  • Lower Dam Type: CGD (Concrete Gravity Dam), H = 70.5 m, L = 280.0 m
  • Lower Dam Effective storage : 7,730,000 m3