All-in-One Services for Digital Construction

BIM Consulting

Railroad

Sinbundang Line double-track electrification Lot 1 (Aug. 2024 – Mar. 2029)

PROJECT OUTLINE

Client
KOREA RAIL NETWORK AUTHORITY (KR)
Stage
Tender (2023, Award), Detail Design & Construction (2024 ~ 2029)
Contractor
HJ Shipbuilding & Construction Co., Ltd.

PROJECT FEATURES

  • BIM mandates Project at Detail design stage.
  • BIM Level of Detail (LOD): 300–350
  • Model-based quantity take-off & drawings.
  • Common Data Environment. (CDE)
  • Alternative design for Alignment of Tunnel designs : To reduce travel time between subway stations, Reviewing subway station locations for passenger convenience.
  • Optimized design for tunnel lining types.
  • Tender Assistance : Model-based design drawings, Model-based quantity take-off.